O&R plans to perform maintenance work on a gas pipe located on the Mid Delaware River bridge between Port Jervis and Matamoras starting on 10/14/24 and will continue for 1-2 weeks. The work will require traffic control setup which will consist of a lane shift to maintain two lanes of traffic open.